• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Appendix O: CROSS REFERENCE LIST EARTH. AUGER

TM-5-3820-245-14-P Auger Earth Skid Mounted Texoma Model 270-9 Reedrill Inc. Manual
Page Navigation
  399    400    401    402    403  404  405    406    407    408    409  
TM 5-3820-245-14&P
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Q - QUARTERLY
S - SEMIANNUALLY
A - ANNUALLY
B - BIENNIALLY
H - HOURS
M - MILES
AUGER, EARTH, SKIT MOUNTED MODEL 270-9
INTERVAL
ITEM TO BE INSPECTED
EQUIPMENT IS NOT READY/
ITEM
Q
S
A
B
H
M
PROCEDURE: CHECK FOR AND HAVE REPAIRED, FILLED OR
AVAILABLE IF;
NO.
ADJUSTED AS NEEDED
8
100
BATTERY
Check specific gravity of electrolyte in each cell (more frequently
in warm weather).
9
1000
HYDRAULIC OIL SYSTEM
Change fluid and filter.
10
500
FOUR SPEED TRANSMISSION
Drain, flush, and fill to level plug (13 qt.).
11
1000
RIGHT ANGLE DRIVE
Drain, flush, and fill to level plug (3 qt.).
12
1000
FINAL DRIVE
Drain, flush, and fill to level gage (31 qt.).
13
1000
WINCH
Drain, flush, and fill to level plug (1 qt.).
14
100
ENGINE CRANKCASE OIL PAN
Drain and refill to full mark (12 qt.).
Army Oil Analysis Program will
be used in lieu of hourly inter-
val.
Change 1 48






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.