TM 5-3805-296-23-6
0405
INSTALLATION CONTINUED
12. Install new O-ring (Figure 23, Item 4) on hydraulic hose (Figure 23, Item 5).
13. Install hydraulic hose (Figure 23, Item 5), two flange halves (Figure 23, Item 3), four washers
(Figure 23, Item 6), and bolts (Figure 23, Item 2) on leveling valve (Figure 23, Item 1).
Figure 23. Front Hydraulic Hose.
0405