29. Position three cribbing blocks (Figure 19, Item 3) and hydraulic jack (Figure 19, Item 2) under machine.
30. Raise machine from stand (Figure 19, Item 1).
31. Remove stand (Figure 19, Item 1) from under rear of machine.
32. Using hydraulic jack (Figure 19, Item 2), lower machine.
33. Remove hydraulic jack (Figure 19, Item 2) and three cribbing blocks (Figure 19, Item 3) from under machine.
Figure 19. Jack.
0372
END OF TASK
FOLLOW-ON TASKS
000372
1. Adjust slack adjuster (WP 0176).
2. Remove wheel chocks (WP 0454).
3. Verify correct operation of machine (TM 5-38505-296-10).
END OF TASK