• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUNCTIONAL TEST. - Continued
FUNCTIONAL TEST. - Continued

Technical Manual For Collective Protection Equipment, Guardrail With Accessories
Page Navigation
  10    11    12    13    14  15  16    17    18    19    20  
img
. . . .
TM
3-4240-309-20&P
2-7. FUNCTIONAL TEST (CONT).
LOCATION
ACTION
INDICATION/REMARKS
ITEM
Protective Entrance
Indicator lights
Press to test lamps:
Control Module
LOW PRESSURE (17)
Light will glow when
(PECM)
pressed. Replace lamp if
necessary (p. 2-76).
Light will glow when
PURGE (18)
pressed. Replace lamp if
necessary (p. 2-75).
Dome light (20) will
Set dome light switch
show white light.
(19) to WHITE.
Replace lamp if
necessary (p. 2-77).
Dome light (20) will
Set switch (19) to RED.
show red light. Replace
lamp if necessary
(p. 2-77).
Dome light (20) will
Set switch (19) to OFF.
go off.
PURGE light (18) will
Rotate TIMER (21) fully
Timer
glow.
clockwise.
OCCUPIED light in
compartment control
module will glow
PURGE AND OCCUPIED
Allow TIMER (21) to
lights will go off.
return to 0
(approximately 5
minutes).
Close van door and PE.
After van 4 is complete,
Repeat functional test
proceed to next page.
for van 4.
2-6






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.